/
3.2.5
3.2.5
Table of Contents
Version | 3.2.5 |
Available as of Date | Sep 25, 2024 |
Technical Changes
Enhancement
Approval
Moving of Transaction Date upon approval, depending on the selected preference, overrides the standard NetSuite behavior of auto-calculating the Due Date. Due Date is retained when transaction date is moved.
Bug Fix
Conversion
FlowAP Subsidiary Setup : Move Transaction Date When = Period is A/P Locked
A/P Locked validation for a period is now being checked per Subsidiary and not for the entire Period
Bundle Update Steps
Follow Bundle Update Steps from 3.2.4 for versions 3.2.3 and older:
Install the supporting bundle: [STA] FlowAP - Entity Bank Details Field (bundle id: 535109).
Bundle update of FlowAP to 3.2.5. Bundle update required preferences:
Required Actions for the End user
N/A
Send an email to support@staria.com for questions or concerns regarding this topic.